CERC Rejects Phased Commissioning for 36 MW Wind Project Due to Connectivity Delay
2026-06-30 · Central Electricity Regulatory Commission
The Central Electricity Regulatory Commission (CERC) dismissed Petition No. 130/MP/2026 filed by Continuum Power Trading (TN) Pvt. Ltd. (CPTPL) seeking relaxation of Regulation 22(3)(c) of the Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2023 to permit phased commissioning of its 36 MW wind power project in Gujarat in tranches of at least 5 MW. CPTPL applied for connectivity on 20 July 2024 with a scheduled commissioning date of 31 March 2025, but the Central Transmission Utility of India Limited (CTUIL) issued the in-principle grant of connectivity only on 23 May 2025, with a likely start date of 19 November 2026, and the final grant on 14 August 2025. CPTPL argued that the delay in connectivity grant was a force majeure event and that it had completed 21 MW of the project and sought to commission this capacity by 30 June 2026 to avail a 75 percent waiver of Inter-State Transmission System (ISTS) charges available under the Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) (Fourth Amendment) Regulations, 2025 for wind projects achieving commercial operation date between 1 July 2025 and 30 June 2026. CERC held that connectivity can only be granted when the transmission system is available or likely to be available, rejected the force majeure claim, and noted that even with the deferred connectivity date, CPTPL was given 18 months to implement the project compared to the original 7 months. The Commission held that Regulation 22(3)(c) of the IEGC, 2023 mandates a trial run for the entire 36 MW capacity in a single batch for entities covered under Regulation 4.1(e) of the Central Electricity Regulatory Commission (Connectivity and General Network Access to the Inter-State Transmission System) Regulations, 2022, and found no grounds to relax this requirement. CERC rejected the petition, stating that the petitioner delayed commissioning the entire capacity and the case did not merit relaxation to permit trial run for a smaller capacity.